Announced on November 6 by the TEATT minister, Project Walk is meant to link the St. Maarten cruise port to Dock Maarten, at the east end of the Philipsburg Boardwalk, around mid-December 2026.
A new pedestrian route is expected to connect, around mid-December 2026, the St. Maarten cruise port area to Dock Maarten, at the eastern end of the Philipsburg Boardwalk, near Greenhouse Restaurant. The project, called Project Walk, was announced on November 6 by TEATT Minister Grisha Heyliger-Marten during the 2027 budget debate.
According to the minister, the Harbour Group is aiming for an opening around mid-December. The goal is to give cruise passengers another way to walk into town, spread visitors more evenly toward the Boardwalk, Front Street and the rest of Philipsburg, and ease congestion at the current port entrance, especially on days when several ships are alongside.
An announced project, not open yet
No detailed timetable or public plan has been issued so far: this remains an announced project, and its real effect will be clearer once the path is in use. The minister also restated the current water-taxi arrangements: when one ship is in port, passengers are dropped at Bobby’s Marina and Captain Hodge Wharf; when two or more ships are in, a third drop-off point is added.
The route sits in an already busy cruise quarter, between Point Blanche and Great Bay. The Pelican Park lookout overlooks the bay, and Philipsburg Beach (Great Bay) is a short walk from the Boardwalk. Ship calls continue through the winter, after Icon of the Seas and ahead of later arrivals such as Hero of the Seas in summer 2027.